Portal Platform Updates - Work Orders Portal Platform Updates - Work Orders

Portal Platform Updates - Work Orders

Work Orders, Holdback & Portal Updates โ€” August 2026 | Skylight Partner Help Center
๐Ÿš€ Live Now โ€” Portal updates effective August 4, 2026
Skylight Partner UpdatesNew FeatureChangeAugust 2026

Work Orders, Holdback
& Portal Updates

A summary of the latest enhancements now live in the Portal. This release introduces Work Orders, Holdback rate configuration, and updates to M1 Review, Quote Summary, and M1 disbursements โ€” review each section carefully.

๐Ÿ“„ Work Orders
โš™๏ธ Holdback Configuration
๐Ÿ”„ M1 Review Update
๐Ÿ’ต Quote Summary Update
๐Ÿ’ณ M1 Disbursement
๐Ÿ“Š Holdback Reporting
๐Ÿ“„
Update 01 ยท New Feature
Work Orders
Now Available

When a Work Order is triggered on an account, you'll be notified and can complete it directly from the SKY Portal โ€” no separate e-signature tool needed.

  • Real-Time Status โ€” Track live Work Order status directly in the NTP Checklist
  • Signed Document Access โ€” Once signed, the Work Order is available in Document Management under a new "Work Orders" section
  • Automatic Underwriting Ticket โ€” A Zendesk ticket is created automatically once the Work Order is signed, so NTP review can continue
โš ๏ธ Action needed: For new Leases created today and moving forward, signing the Work Order is required as part of the NTP requirements.
โš™๏ธ
Update 02 ยท New Feature
Installer Holdback Configuration
Now Available

You can now configure your Holdback Rate directly from the Admin Portal.

  • Default rate is $0.00/W, expressed in dollars per Solar Watt
  • Your configured rate is automatically applied to every new Lease as soon as it's created (PRE1) โ€” no need to set it per deal

We've updated how the M1 Review handles material list resubmissions, based on feedback from Natalia & JT.

  • When an Installer re-submits their material list because the Quote doesn't match, the status will now clearly display "Pending Supplier Confirmation"
  • No action required on your end โ€” this makes it easier to track where a submission stands during review
๐Ÿ’ต
Update 04 ยท Change
Quote & Simulation Summary Improvements
Updated

Based on Sales and Underwriting feedback, the Quote and Simulation Summary have been updated for Installers and Sales Reps.

  • Quotes are now calculated using the Net EPC Amount
  • New metrics are included, such as the Effective EPC Rate

Installers and Suppliers can now receive up to 50% of the Gross EPC Amount during the M1 disbursement.

๐Ÿ“Š
Update 06 ยท New Feature
Holdback Reporting
Now Available
  • View your Holdback disbursements directly in the Reporting section
  • Include Holdback disbursements in your exported reports

Reach out directly to your Skylight Account Manager with any questions about these updates or how they affect your team's workflow.

Devin Moody
AZ ยท NM ยท MA ยท CA