The following checklist reflects Skylight Lending comprehensive internal review process for M1s.
All criteria must be met to qualify for M1, and these requirements are consistent throughout our entire ecosystem.
Portal Qualifying (PQ)
Item: |
Criteria that will be reviewed |
---|---|
Account Details |
|
Contract Details |
|
Portal Qualifying |
Operational
Item: |
Criteria that will be reviewed |
---|---|
Monitoring Portal Site Identifier (Optional for M2, though suggested for initial review) |
|
Regulatory approvals |
|
Incentives (I/A) |
|
Design Package Files
Item: |
Criteria that will be reviewed |
---|---|
Planset |
|
Production Model |
|
Shade Report |
|
Photo Documentation of Installation
Item: |
Criteria that will be reviewed |
---|---|
Project Site |
|
Roofing |
|
Electrical Requirements |
|
(I/A) Storage |
|
Commissioning Process |
|
Requirements for Approval
All requirements must be met to achieve M2. While these requirements are consistent across our ecosystem, the QC technician reviewing the submission may, at their discretion, grant conditional approvals. Conditional approvals are M2 approvals that allow some flexibility, permitting certain missing or incomplete items to be submitted at M3. Conditional approvals are automatically granted when possible – Skylight Lending does not grant exceptions upon request.
Possible scenarios for Conditional approval consideration: Minor missing uploads or basic installation issues resolved with a site visit.
Scenarios that will not qualify for Conditional approval: Code violations, violations of manufacturer specifications, significant workmanship issues, high error rates in submissions, etc.